Thank you all for your contributions while the DAO & Delegates finalized the voting method amendment for SPP2. Following a social temp‑check, Amendment 6.5 was the option with the highest votes and will be used to govern the upcoming DAO‑wide SPP2 selection vote.

Because the amendment process pushed back original target dates, MetaGov is publishing an updated facilitation plan and timeline that reflect the new voting method and ensure adequate notice for all parties.


Current State of the SPP2

All other aspects of program facilitation outlined in SPP 2 Facilitation Plan (Original) remain fully in effect. The sole changes introduced by this amendment are (1) voting algorithm and (2) the temporary reopening of an application edit window, which closes on 4/27/25 23:59 UTC.

Key Topics Other/Notes
:green_circle: Applications submitted by 3/31/25 Please note there will be no new applications accepted into the program.
:green_circle: All applications are eligible per the program requirements. NA
:green_circle: Amendment 6.5 Passed & changes the voting algorithm used in the SPP2 More in About the Voting Changes.
:green_circle: Front-end Dev & Testing The voting updates will be joined with the development of custom front ends by three different entities. (more on this below)
:white_circle: SPP2 Vote Standard 5 Day Social Voting window.
:white_circle: SPP2 Vote Review MetaGov & public review of the results to ensure the correct ranking.

Updated Key Target Dates

(All dates are in UTC)

Task Start End Days
Update window for current applications now 4/27/25 5‑6
Front‑end dev & testing now 4/28/25 6‑7
SPP2 Voting 4/30/25 (alt. 5/7/25) 5/5/25 (alt. 5/13/25) 5
SPP2 Voting Review 5/5/25 (alt. 5/13/25) 5/10/25 (alt. 5/18/25) 5

SPP‑2 voting window is presented with two possible schedules. The earlier set of dates remains the target; however, if front‑end development or testing requires additional time, the vote will shift to the alternate window. MetaGov will continue to monitor progress closely and adjust only when necessary to preserve a seamless, transparent experience for applicants, delegates, and all DAO stakeholders. Our priority is to safeguard both the integrity of the vote and the broader timeline of the program.


Change Updates

Applications - What Changed?

Teams get a final opportunity to tune proposals given the updated ballot structure.

  • Edits may be submitted until 27 Apr 2025 23:59 UTC. After that point, applications become final for ballot preparation.
  • @daostrat.eth will reach out to applicants on all available channels. Please also reach out with questions.

FE Dev & Testing

To maintain a single, transparent source of truth, MetaGov is preparing a public Google Doc that details the Amendment 6.5 counting algorithm and sample outputs; this document will be linked here as soon as it is complete.

  • Front‑end work is being facilitated by MetaGov steward @alextnetto.eth, with active contributors Blockful, Agora, and Lighthouse all building integrations. :fire: :bank: :fire:
  • @alextnetto.eth will also share testing information for community review.
  • Target completion for QA remains 4/28/25; the contingency window extends to 5/7/25 if blockers arise.

Voting Method

Amendment 6.5 replaces rank teams only with a rank‑budget system that evaluates each budget entry on its own merits.

As stated in Amendment:

EP6.5 goes further by enabling voters to place an extended budget request below multiple basic budgets. This allows voters to express preferences such as: “This team should receive its extra funding, but only after these other teams get their basic funding.”

  • Summary- Every team’s Basic ask and optional Extended ask appear as separate rankable options. Put differently, a team’s Extended ask competes with every other entry, not just its own Basic ask.
  • Allocation - ranked list, funding items until “None Below” is hit.
  • Voter action - rank entries in the exact order you want funds deployed,no manual math required.

Check List (Key Information)

For Applicants

  • Expect direct outreach. MetaGov will contact each applicant via this thread, Telegram DM, and Forum PM.
  • Review and, if necessary, revise your proposal. The edit window closes 4/27/25 23:59 UTC. After that, applications are frozen for voter preparation.

MetaGov Recommendation → Please note the changes to your proposal as a comment to make it easier for the delegates to see! :eyeglasses:

Watch for MetaGov updates. We will post interim notices (e.g., algorithm doc link, ballot‑freeze list) in this thread.

For Delegates

  • Understand the amendment. Read the passed Amendment to understand the voting algorithm.
  • Track live application edits. Applicants may adjust their content through 4/27 ; re-check the index on 4/28 for the final list.
    _
  • MetaGov will publish an easy-to-follow explainer and a worked example of the 6.5 algorithm; the link will be updated throughout the week.
  • Stay updated! This checklist—and its resource links—will be refreshed periodically up to the 4/27/25 Freeze.

Thank you to all contributors for working with applicants, FE contributors, and delegates to keep SPP2 moving forward! :saluting_face:

Program Updates, Links, and Notes

[:: to be updated ::]

12 Likes

Amazing update @daostrat.eth & metagov - Hyped for the vote

5 Likes

This is great - thank you @daostrat.eth!

1 Like

SPP-2 participants — application edit window closing soon!

There is ~ 4 hours (-10 minutes) remaining to make any final changes to SPP2 proposals.

Officially, The suggested window closes ** 4/27/25 23:59:59 UTC** ().


Next steps

MetaGov will publish a more detailed update tomorrow covering:

  • Updated application Index sheet & forum thread
  • Status of the 6.5 counting-algorithm build & front-end tests
  • A definitive call on whether voting will commence 4/30 or shifts to the alternate 5/7 slot

Thank you for keeping an eye on timelines and for being flexible :saluting_face:

1 Like

The recommended window for application changes has ended as of 4/27/25 23:59:59 UTC.

The SPP2 Application Index is updated, and changes are noted as a comment on the SPP2 Application Index thread.

:rocket:

1 Like

Thanks @daostrat.eth for all your efforts to coordinate these updates! I noticed that the SPP2 Application Index doesn’t yet reflect our edits that were strategically submitted just before the deadline.

In summary, the key change to reflect in the SPP2 Application Index is that we made a number of enhancements to our proposal. This includes removal of our previous $1.3m “extended” budget to proactively narrow our focus on the highest value projects and provide more funding opportunities for other teams whose proposals would be great for ENS!

Appreciate our edits were easy to miss! The forum doesn’t bump existing posts when they are edited, only when new replies are added. Our edits were strategically submitted just before the deadline, and I only added a new reply on our proposal thread summarizing the previously submitted edits a few minutes ago after you made your post above.

You’re welcome to verify the edit timestamps on our previously existing proposal posts :grinning::+1:

1 Like

Thanks for the update, Cameron!

1 Like

Hi @lightwalker.eth, we confirmed that these changes were made by the deadline.

Sorry about the oversight here. The substance of the changes is in the replying comment (second section) of your application. Appreciate you pointing this out - corrections made and noted!

1 Like

Thanks @daostrat.eth :raised_hands:

Yes sorry for having to split our proposal into 2 posts like that. Back at the end of March when we first submitted our proposal the forum said it included too much content for a single post. There were too many deliverables. :sweat_smile: We had to split the Scope of Work (section 4) out into a separate reply post.

1 Like

MetaGov just finished a coordination call on the best way forward for SPP-2. Here’s the plan we agreed on.


Testing

  • Front-end contributor builds are test-ready.
  • @alextnetto.eth will post a Snapshot sandbox ballot plus a reference spreadsheet shortly.
  • The test ballot contains 10 fake providers (each with Basic and Extended asks). This will be an open task to cast sample rankings and verify that every UI shows the same live ranking and final tally as the spreadsheet.

What happens next

  • If everything matches (live display and algo output):
    • Open the real vote late 30 Apr (UTC) → close Mon 5 May.
  • If we hit bugs in the voting UI or algo calculations:
    • Fix, retest, and push the vote to ~6 / 7 May → 12 May (exact date depends on how long the patch cycle takes).

Will post an update in here, when Neto drops the test link.

MetaGov did consider pushing the vote back one week by default, but we agreed that if the front ends and algorithms perform correctly, it makes sense to keep the earlier window.

Thanks!

5 Likes

Following the MetaGov weekly with participation from front-end contributors (Blockful, Agora, Lighthouse), MetaGov is adjusting the voting timetable by one week to allow for a more thorough testing.


New key dates

Milestone Date (UTC)
Final UI test window now → 6 May
Snapshot vote opens 7 May
Snapshot vote closes 12 May
Result review 12 → 17 May

How to help this week

  1. Test ballots are live. Links here.
  2. Cast a sample ranking and compare the live tally against the reference spreadsheet.
  3. Report mismatches in this thread or ping @alextnetto.eth on Discord.
  4. Applicants: no new edits—applications remain frozen; this is UI testing only.
  5. Delegates: use the extra time to review applications and Amendment 6.5 materials!

All other program rules remain unchanged— almost at the finish line!